Project: Facilities Head Office
Architect: Brown Falconer Group
Project Value: $5.20 Mill
Harrold & Kite delivered the redevelopment of Osmoflo’s Head Office, incorporating innovative construction methods to achieve an efficient, high-quality outcome.
The new facility was built on a raft slab, with prefabricated precast concrete panels forming pod-like divisions throughout the structure. These panels were supported by a structural steel network, with prefabricated Delta Core floor panels, manufactured off-site in Western Australia used to form the second-storey slab. This system allowed the panels to be produced concurrently with structural erection and installed on-site in just days, eliminating the need for traditional formwork and in-situ concrete. The efficient use of prefabrication significantly reduced construction time.
Services installation commenced immediately following floor panel placement, accelerating the transition from structural works to internal fitout.
This project showcases Harrold & Kite’s ability to deliver complex industrial facilities through smart construction practices, minimising time on site while maintaining build quality and meeting the operational needs of a high-performance client.